The wind turbine development in Cranford, East of Kettering, was a project for Farm Wind with short deadlines that relied on the unanimous support of the local community. Without community consent, the turbines could not have been built. With time short for this project, Dragon IS had to work efficiently and effectively to produce a quotation for the 500kVA export the development required.

In addition to being a leading independent connections provider for large scale solar energy sites, Dragon IS has also been an essential part of numerous high profile wind turbine developments. Once full consent of the local community had been obtained, Dragon IS installed 200 metres of cable in trenches provided by the client in a manner that ensured the levels of disruption were minimal. We then designed and installed a bespoke 11kV metering substation. The cable and metering substation were then adopted by WPD.

Want an electricity distribution network designed and installed to meet your needs, your budget and your deadline? We should talk.

Download Case Study PDF

Our Solution

  • Over 200 meters of cable
  • Cable adopted by WPD
  • Designed and installed 11kV metering substation
  • Metering substation adopted by WPD
  • Customer Farm Wind