The Connection Specialists
Call us on 0333 666 8666

Francis Combe Academy

Education

At a Glance

Francis Combe Academy is part of the government’s ‘building schools for the future’ initiative and is the first academy to be built in Hertfordshire. This flagship £24m development was very much in the public eye and needed to go without a hitch. Creating the new academy involved 81% new build and 19% refurbishment of a general, teaching block. The finished building, accommodating 1050 pupils was over a combination of 2 and 3 stories and needed to cater for specialisms in art, design and communications.

Our turnkey solution was carefully developed by our experts and involved close collaboration with construction firm Kier and DNO UKPN. The infrastructure provided 1000kVA for the new school, we also created a substation and developed a bespoke LV Panel. 

Want an electricity distribution network designed and installed to meet your needs, your budget and your deadline? We should talk.

Download Case Study PDF

Our Solution

  • Flagship Academy part of government initiative
  • Value engineered the off-site works
  • Provided a 1000kVA low voltage connection
  • Designed integrated substation and bespoke LV panel
  • Connection adopted network by local DNO UKPN
  • Customer Kier Construction.