The mixed use development at One Tower Bridge, London Borough of Southwark, was a large scale project for Berkeley Homes. In March 2011 Southwark Council granted the company planning permission to build 406 flats, 13 small commercial premises, 2 large commercial sites and establish 20 landlord supplies on the sought after riverside site. DragonIS provided an interesting design and programme which allowed the client to have the substations constructed above the basement car park.

Berkeley Homes appointed DragonIS in November 2011 to design and build the infrastructure solution for the project. This involved a load of 3,141kVA and connection to an 11kv network, as well as liaising with the IDNO, ESP Electricity. In addition to this DragonIS provided a 1000kVA temporary building supply, which delivered power to the site, while the main grid connections were being installed.

Want an electricity distribution network designed and installed to meet your needs, your budget and your deadline? We should talk.

Download Case Study PDF

Our Solution

  • Mixed Use Development
  • Won project in November 2011
  • Required Load of 3141 kVA
  • Provided 1000kVA Temporary Building Supply
  • 11kV connection
  • Client Berkeley Homes
  • IDNO development
  • Innovative design and programme of works